What Happens to the Old Staircase on Demolition Day
Staircase demolition day gets far less attention than the new stair that follows it. Most of the conversation is about the new staircase, and considerably less goes to the morning when the old one leaves, which is the part of the job most likely to produce a surprise.
What does removing an existing staircase involve?
More than it looks. An old stair can be holding something, at minimum the guard along the opening and sometimes part of the floor edge, so it cannot simply be cut out. The drywall around the stringer and skirtboard can come away with them. The opening needs a guard the moment the flight is gone. And for a while there is no way to the upper floor. Every one of those is manageable, and every one of them is better planned than discovered.

A stair takes its place early in the life of a house, so everything around an old one, the flooring, the drywall, the trim and in some cases the floor framing at the opening, was fitted to it rather than the other way around. Taking it out disturbs all of that.
How staircase demolition day runs
Protection goes in first
Floors along the route, the doorway to the room, and anything that cannot be moved out. Demolition dust travels further than people expect and carries whatever has collected under the treads over the years.
The railing comes off
Guards and handrails come off before the flight itself is touched, because they are in the way and because the opening will need a temporary guard in their place.
A temporary guard goes up
The moment the flight is out, there is an open hole in the floor, so a temporary barrier at the opening goes up before the stair comes out, not after.
The flight is cut free and removed
Often in sections. The treads and risers come off, then the stringers, which are the part fixed to the structure at the top and bottom.
The opening is checked and made good
This is the valuable part of the day. With the stair gone, the opening can be measured properly: squareness, floor to floor height on both sides, the condition of the framing at the header.
Debris out, site swept
A staircase makes a surprising volume of waste. It is best cleared the same day, because a pile of broken treads in a hallway is a hazard in its own right.
What can turn up when the stair is out
Houses move, and framing can be out of square. A stair built to a drawing that assumed square may not fit an opening that is out across its length.
Measured at the left wall and again at the right, the two numbers can differ. The new stair has to be built to the reality, not the average.
In an older home, a stringer can be doing work nobody documented.
Ductwork, a drain, an electrical run. Discovering it on staircase demolition day gives you time. Discovering it on installation day does not.
Staircase demolition day is not the destructive part of the project. It is the day you finally get accurate information.
The gap in the middle
The part households underestimate is the interval with no staircase, and how long it lasts depends on when the new stair is measured. A new flight built from a measure taken before demolition can be ready to go in soon after the old one comes out. One built to dimensions taken after the old one is out, which shows the opening as it really is, leaves a gap for as long as the making takes.
That is a real trade off, and it deserves to be made deliberately rather than by default. A measure taken before staircase demolition shortens the gap but leaves more to chance on the fit. A measure taken after it lengthens the gap and takes the guesswork out of the opening. Which one is right depends on whether there are bedrooms upstairs and who is sleeping in them. The province publishes its building codes and standards online as a reference for anyone replacing a stair.

After staircase demolition day the new stair is installed on site, and the railing goes in before the paint and floors are finished, like this black bar railing standing over a still bare subfloor. Then the temporary barrier comes down.

Not every project needs a staircase demolition
Where the existing stair is sound and only the surface has aged, the whole sequence above may be avoidable. A carpeted stair can sometimes be converted in place: the carpet comes off, the existing treads are capped or replaced, and the flight never leaves the building. Whether that is possible comes down to what is under the carpet, covered in converting a carpeted staircase to hardwood.
Questions about staircase demolition
How long are we without a staircase after demolition?
It depends on when the new stair was measured and whether the opening needs framing work. A stair built from a measure taken before demolition shortens the gap; one built to a measure taken after demolition takes longer but fits the opening as it really is. Either way, plan the house around a period with no stair to the upper floor.
Can we stay in the house during staircase demolition?
In many cases, yes, provided there is another way upstairs or nothing upstairs you need that day. The bigger issues are dust and the open floor edge. Protection along the route and a temporary barrier at the opening deal with both, and neither improves by being ignored.
Will the drywall be damaged?
Expect some. The skirtboard and the stringer are fastened through to the structure, and the finish around them can come off with them. Plan for drywall repair and repainting as part of the job rather than as a surprise at the end. Ironwood does not paint, so that work goes to your painter.
Planning the day the old stair comes out
Send Ironwood photos of the existing stair, with a note on whether there is a second way upstairs and who needs to be in the house, for a quote.