What an Inspector Checks on a New Staircase
A new staircase is part of the building inspection. The inspector is not judging the style. They are checking a short list of measurements that keep people safe on the stair.
What does an inspector check on a staircase?
Riser height and uniformity, handrails, guard height, and the size of openings in the guard. The rules for a house are set out in the province’s published building codes, and the inspector on the project decides how they apply.
The new staircase checklist
| Item | What gets looked at |
|---|---|
| Riser height | The height of each step in the flight |
| Riser uniformity | How evenly the steps repeat from the bottom to the top |
| Handrail | Where the handrail runs and how far it carries |
| Guard | Every open edge of the stair, the landings and the opening |
| Guard height | The height of the guard along the stair and around the opening |
| Guard openings | The gaps between balusters, bars or glass panels |
| Triangle under the guard | The space formed by the riser, the tread and the bottom rail |

A railing and a flight of treads: the parts an inspector measures.
Where stairs can need a second look
- ✓The bottom step. Flooring added after the stair is built changes the first riser.
- ✓The triangle. The space between the bottom rail, the tread and the riser is easy to miss.
- ✓Guards on landings. The open edges of landings and the upper floor are looked at too, not just the stair itself.

The guard continues around the opening, not just along the stair.
Planning a new staircase around the inspection
The easiest inspection is the one planned for at the drawing stage. Before a new staircase is built, settle the finished floor height at the top and the bottom, because tile, hardwood or a thick underlay each change the first and last riser. Mark every open edge on the plan, including landings and the sides of the opening on the upper floor, so the guard is drawn wherever there is a drop, not only beside the treads.
Then look at the railing as a set of openings. Balusters, horizontal bars and glass panels each leave a different gap, and the triangle at the bottom of a sloped guard is the one that gets missed. The photos above show two familiar answers: black metal balusters under a black top rail on a turning stair, and a dark wood handrail over black spindles that carries on around the opening on the main floor.
Keep the drawings, the floor finish schedule and photos of the stair before drywall in one place. If the inspector has a question on the day, the answer is already on hand.
Checking the code yourself
Code Compass, by RibitOS, an Ironwood company, answers building code questions with the exact section. More at ribitos.com.
Questions about a new staircase inspection
What does an inspector measure on a new staircase?
Riser heights and how evenly they repeat, the handrail, the height of the guard and the size of the openings in it. The checklist above names each item. The figures for a house are set out in the provinceās published building codes, and the inspector on your project has the final say on how they apply.
Why does the bottom step need extra attention?
Flooring laid after the stair is built raises the floor at the bottom, and sometimes at the top, so the first or last riser no longer matches the rest. Knowing the finished floor height before the stair is made keeps every riser in the flight matching its neighbours, which is exactly what the uniformity check looks at.
How do I get a quote for a new staircase in Calgary?
Send Ironwood photos of the space or a copy of the plans, along with the floor finishes planned at the top and bottom of the stair. Ironwood works in Calgary and the surrounding area. Call (403) 552-1007 or use the contact page to start an estimate with your photos attached.